| ==Phrack Inc.== | |
| Volume Two, Issue 19, Phile #5 of 8 | |
| Facility Assignment and Control System | |
| Written by Phantom Phreaker | |
| INTRODUCTION | |
| ------------ | |
| The Facility Assignment and Control System (FACS) is an integrated | |
| network component system that most phreaks and hackers know of from an old | |
| file named 'FACS FACTS' written by Sharp Razor. While this file provides an | |
| accurate description of the FACS system, it is lacking in detail and length. | |
| This file will provide accurate information about the FACS system and is | |
| intended for the true telecom enthusiast (i.e. this article is not for people | |
| who use codes and call it 'phreaking' or for people who think that phreaking | |
| is just 'making free phone calls'). Hopefully the phreaks and hackers of the | |
| world who want to know how things work in the telephone network will benefit | |
| from this information. Any malicious use of this information is strictly | |
| prohibited. The contents of this file are for informational and educational | |
| purposes only. | |
| GENERAL DESCRIPTION | |
| ------------------- | |
| FACS can be described as a full-featured outside plant and central office | |
| facilities assignment system. For the people who are unfamiliar with these | |
| terms, the outside plant is the portion of the telephone network that runs | |
| from a telco office (such as a class five end office (EO)) to the subscriber, | |
| including manholes and distribution/access points such as Serving Area | |
| Interfaces (SAI) which are large, double-door outdoor equipment cabinets which | |
| allow the repair craft to repair, test, and access a multitude of service | |
| lines in that area. | |
| FACS is made up of five component systems, or sub-systems, and some of | |
| these are also used as stand-alone systems (i.e. in an area that does not use | |
| FACS, COSMOS can be thought of as a stand-alone system). | |
| The component systems are: | |
| PREMIS - PREmise Information System | |
| SOAC - Service Order Analysis & Control | |
| LFACS - Loop Facility Assignment and Control System | |
| COSMOS - COmputer System for Main Frame OperationS | |
| WM - Work Manager | |
| FACS is used by many departments and work centers in the BOC network. A | |
| general example of telco interaction will be included later in the article. | |
| PREMIS | |
| ------ | |
| PREMIS supports the customer negotiation (i.e. while a customer talks with | |
| a BOC service rep, PREMIS is the computer system the rep has access to) and | |
| service order (SO) preparation process (a SO is basically a request for | |
| service). PREMIS is a computer-based information storage and retrieval system | |
| designed to support the Residence/Residential Service Center (RSC), and in | |
| some cases, the Business Service Center (BSC). The RSC is the center that | |
| residence customers deal with, and the BSC is the center that business | |
| customers deal with. | |
| PREMIS provides fast easy access to customer address verification for | |
| numbered and unnumbered addresses (information is stored by telephone number | |
| not address), telephone service status at an address (whether the phone is in | |
| service, disconnected, pending connect, pending disconnect, disconnected due | |
| to non-payment, etc.), telephone number assignment for customers (PREMIS can | |
| generate a list of available telephone numbers in a given exchange and the | |
| available TNs come from COSMOS) and facility assignment data for outward | |
| orders. | |
| The following PREMIS features are available to the service reps and have | |
| special significance to the LAC: | |
| Customer Negotiation: | |
| Provides customer service address check against a mechanized Street | |
| Address Guide (SAG). | |
| Provides customer status check to a mechanized facility address file | |
| which identifies potential Interfering Station (IS) conditions. | |
| Provides new telephone number assignments through an available TN | |
| (Telephone Number) file. | |
| Service Order Preparation: | |
| Provides SAG data. | |
| Provides correct address spelling. | |
| PREMIS, as far as I know, does not have any direct dialups so don't get | |
| your hopes up high. There may be other ways to access information in PREMIS | |
| however. | |
| SOAC | |
| ---- | |
| The SOAC system is what interfaces FACS with the BOC SOP (Service Order | |
| Processor). The SOP is what the service reps enter SO information into and | |
| the SOP sends the data entered to the SOAC system. The SOAC system interprets | |
| and validates this input data. | |
| SOAC generates Assignment Requests (ARs) which are sent to LFACS and | |
| COSMOS (see respective sections of this file) to request outside plant (OSP) | |
| and CO facility assignments, respectively. | |
| SOAC receives AR Responses (ARRs) from LFACS and WM/COSMOS and merges this | |
| data and formats the output into a Universal Service Order (USO) assignment | |
| section. This USO is returned to the SOP after SOAC has processed it. | |
| SOAC returns status information and error notification to the SOP. Status | |
| information is what tells the service rep who entered the data into the SOP | |
| whether or not FACS can process that Service Order. Error notifiers are sent | |
| back to the SOP when part of the SO is in error. | |
| SOAC keeps record of status and control information on all SO requests, as | |
| well as the input image and specific data that came from processing. This | |
| information, along with the input image and processing results are referred to | |
| as the pending assignment data. | |
| SOs do not automatically flow through SOAC in all cases. SOAC can analyze | |
| an order to determine if manual assistance is required, and if it is, a | |
| Request for Manual Assistance (RMA) notice is sent to the LAC. LAC personnel | |
| will use SOAC, and possibly other systems in FACS, such as COSMOS/WM and | |
| LFACS, to complete the assignment on that SO. | |
| SOAC also may receive COSMOS system output from certain commands. One | |
| such command may be the IJR command, which sets up a circuit for jeopardy | |
| status. Jeopardy status means that the assignment looks as if it will be (or | |
| already is) behind schedule for completion. An example of this is as follows | |
| (showing COSMOS messages). | |
| WC% IJR | |
| H ORD nxxxxxxxx/TN nxx-xxxx/JR nx | |
| RMK NEED TIE PR FOR nxx | |
| -. | |
| **ORDER nxxxxxxxx HAS BEEN GIVEN JEOPARDY STATUS | |
| CKTID: TN nxx-xxxx | |
| **JEOPARDY REASON: nx mm-dd-yy hh:mm | |
| OUTPUT SENT TO SOAC | |
| **IJR COMPLETED mm-dd-yyy hh:mm | |
| The H-line input is the SO number, where n can be alphabetic and x can be | |
| numeric. TN is the affected telephone number, JR is the Jeopardy Reason, | |
| which is a one alpha/one numeric code, RMK is a ReMarK, in this case, a tie | |
| pair is needed. The section that starts and ends with two asterisks is the | |
| COSMOS output, and the rest of the information should be self-explanatory. | |
| LFACS | |
| ----- | |
| The LFACS system keeps an inventory of outside loop plant facilities, such | |
| as cables (CA), cable pairs (CP), serving terminals, interconnecting points, | |
| cross-connecting terminals, and things of that nature which should be known to | |
| the serious phreak. By the way, if you want to get some very good information | |
| about the outside loop plant, look for Phucked Agent 04's article in the LOD/H | |
| Technical Journal issue number 1. These are excellent files and I recommend | |
| that every phreak read them if they haven't already. Anyway, LFACS also | |
| assigns the outside loop plant facilities to ARs received from SOAC as a | |
| result of customer SO activity. The assignment process is automatic on 95% of | |
| the service requests. | |
| LFACS provides a computerized version of DPAC and ECCR (Dedicated Plant | |
| Assignment Cards and Exchange Cable Conductor Records respectively) which were | |
| previously physical records that were stored at the LAC. The information | |
| stored in DPAC is information such as data about a Living Unit Serving | |
| Terminal, and Living Unit Dedicated Loop Facilities, and ECCR contains | |
| information such as Pair Selection, Add/Break count, Line and Station | |
| Transfer, as well as Work Order (WO) information. Some of this information | |
| may be used by the LAC Field Assistance Bureau to assist the outside plant | |
| craft in obtaining necessary information. | |
| When conditions necessary for LFACSS to automatically respond to a SOAC AR | |
| are not met, a RMA noticed is generated in the LAC. Appropriate people in the | |
| LAC will interact with LFACS, and maybe SOAC and WM/COSMOS to complete the | |
| process of assignment. | |
| COSMOS | |
| ------ | |
| COSMOS has been written about many times, so I will not go into deep | |
| detail about this system as many people are already familiar with it. | |
| COSMOS keeps a database inventory of CO facilities (such as TN, CP, OE, | |
| CS, BL - telephone number, cable pair, office equipment, class of service, | |
| bridge lifter respectively) and assigns these facilities to ARs received from | |
| SOAC as a result of customer SO activity. | |
| COSMOS assists the Network Administration Center (NAC) and Frame Control | |
| Center (FCC) in managing, controlling, and utilizing the MDF and COE, as well | |
| as CO facilities and circuits. COSMOS does assignment of TNs, line equipment, | |
| jumper use/reuse, TP management, frame work management, and other things of | |
| that nature. | |
| When the conditions are not met for COSMOS to respond to a SOAC AR, a RMA | |
| is generated in the LAC (as with the other systems mentioned in this article). | |
| The LAC can then use WM/COSMOS, SOAC, and LFACS to complete assignment. | |
| WM | |
| -- | |
| The WM is what links one set of SOAC/LFACS systems with one or more COSMOS | |
| systems. All input to COSMOS from the LAC is directed through the WM. The WM | |
| provides message switching, load control, and other functions to the LAC. | |
| -EOF- | |
| RC:LINE;CHNG!/ORD 1/TN LOD-LOD-LODH/ESM YES/ESX YES/ESL YES/RC:TRK!/TNN $LOD$. | |
| I hope the information presented in this article has been of interest to | |
| all who read it. I have not included as much information as I could have, | |
| some sensitive information has not been included because it could cause | |
| problems. My personal thanks goes out to the fine people who designed the | |
| FACS system, as well as to all the telephone companies in existence, for | |
| without you, phone phreaks would not exist. Thank you for allowing us access | |
| to your networks, although this access is taken rather than given. Try hiring | |
| a phreak sometime, it might be beneficial. | |
| A note to telecom/computer enthusiasts who read this article: DO NOT | |
| SCREW ANYTHING UP! IF YOU ARE NOT RESPONSIBLE ENOUGH TO USE THIS DATA IN A | |
| WISE AND NON-ABUSIVE WAY THEN DISCARD THIS ARTICLE NOW AND PRETEND LIKE YOU | |
| NEVER READ IT. | |
| This has been a presentation of THE LEGION OF DOOM! (C) 1988+ | |
| ============================================================================== | |